Cheltenham College science block

We designed and installed all Gas, water and waste to their new science block. Each lab was fitted with gas interlocks and auto leak detectors along with Co2 monitors for the safety of staff and pupils. The contract lasted 8 weeks over the summer of 2014 and was handed over on time ready for the September term to start.