Through DIS we installed new customer toilet suites in male and female toilets and included 2 disabled toilet suites. 9 Back to wall toilets and concealed cisterns with push button flushes and 6 sunken vanity sinks were installed along with new urinals. We fitted auto shut off taps for water saving.

We also fitted hot and cold feeds for new bakery section and installed the equipment after.

A large percentage of the works was setting up a temporary cafe and the installation of all pipework to accommodate their new prestige cafe. This included the installation of a new unvented hot water cylinder. The contract lasted 8 weeks and was handed over on time. Most of the work was carried out through the night.