Cotswold Gas Solutions worked in partnership with Klick on a school science lab refurbishment. The scope of works included extending gas and water services to all new outlets, installation of a new hot water heater and extension of waste supply to all new sinks within the laboratory. A new gas guard system was also installed and a Gas Safe certificate was issued on completion of testing....
More No comments
Cotswold Gas Solutions Ltd
37 Willow Road
Cheltenham, Gloucestershire
GL53 8PH
Tel: 01242 244881
Mob: 07979 591733
E-mail: cotswoldgassolutions@sky.com
About: admin
Recent Posts by admin
CGT Lettings
Posted on by admin in case study
Our ongoing work with CGT helps them manage any issues with plumbing and heating systems that arise. We offer a fast call out service and fix most issues within a day of the call. We carry out numerous Gas Safety Landlords Certificates for them which help them maintain their obligation to current regulations....
More No comments
Cheltenham College science block
Posted on by admin in case study
We designed and installed all Gas, water and waste to their new science block. Each lab was fitted with gas interlocks and auto leak detectors along with Co2 monitors for the safety of staff and pupils. The contract lasted 8 weeks over the summer of 2014 and was handed over on time ready for the September term to start....
More No comments
M&S Truro
Posted on by admin in case study
Through DIS we installed new customer toilet suites in male and female toilets and included 2 disabled toilet suites. 9 Back to wall toilets and concealed cisterns with push button flushes and 6 sunken vanity sinks were installed along with new urinals. We fitted auto shut off taps for water saving. We also fitted hot and cold feeds for new bakery section and installed the equipment after. A large percentage of the works was setting up a temporary cafe and the installation of all pipework to accommodate their new prestige cafe. This included the installation of a new unvented hot water cylinder. The contract lasted 8 weeks and was handed over on time. Most of the work was carried out...
More No comments
Primark Department store Bristol
Posted on by admin in case study
Through DIS we installed new male and female toilet blocks in the staff area. The work involved the removal of old sanitary-ware and the alteration of plumbing to suit the new install. We fitted 12 double ceramic sinks and wall mounted push button taps along with 16 new back to wall toilets and concealed toilet cisterns. The work was through the night over 6 weeks and was handed over on time....
More No comments